PROJECTS - Design of new HVAC System and M/E/P tenant fitout design

  • /
  • PROJECTS
  • /
  • Progressive Office Fit-out

Design of new HVAC System and M/E/P tenant fitout design

2 Choke Cherry Lane – for Avison Young Management
20,000 SF tenant space

Project Description:
Features/Activities: Fast Track HVAC Renovation/Tenant Fitout Project

  • Mechanical Scope: Site survey, load calculations, design for replacement of existing constant volume rooftop units with a new VAV rooftop unit and DDC controls with new ductwork layout, new fan-powered VAV boxes for new space layout
  • Electrical Scope: Site survey, design of lighting, power, fire alarm for new layout. Plumbing Scope: Site survey, design for new restrooms, galley, sprinkler system modifications.